Project outline
Construction of an electricity interconnector project.
Reason of Categorization
The project includes sensitive sector (submarine cable) under the Environmental Guidelines.
Documents that JBIC has already acquired
- Final ESIA for OHTL Portion1-Arabic
- Final ESIA for OHTL Portion2-Arabic
- Draft ESIA for OHTL Portion3-Arabic
- Draft ESIA for Submarine cable-Arabic.
- Approval Letter Portion1
- Approval Letter Portion2
Remarks
Because of a part of documents necessary for environmental reviews were not available at the time that a decision on the funding must be made, we will disclose the documents which is available at this point. The documents which is not disclosed at this point will be disclose after obtaining them. Results of JBIC's Interim Environmental Review conducted prior to a decision-making on the funding (Interim Environmental Examination Report)
* Date of Release:July 15, 2022
* Category:A
* Project Site:
Kingdom of Saudi Arabia
, Madinah Province, Tabuk Province
* Reference Number:2022-0050