| August 04, 2025 |
JBIC Untied Loan to a financial institution for supporting the automotive industry in India |
2025-000003662 |
| Republic of India |
FI |
Environmental Review
|
|
| July 29, 2025 |
Credit Line under GREEN |
2025-000003707 |
| The Republic of Benin |
FI |
Environmental Review
|
|
| July 16, 2025 |
JBIC SAVE Two-Step Loan to TTLCL |
2025-000003754 |
| Kingdom of Thailand |
FI |
Environmental Review
|
|
| July 11, 2025 |
Clean Ammonia Production and Sale |
2025-000003508 |
| United States of America、 Louisiana |
B |
Environmental Review
|
|
| July 02, 2025 |
manufacturing and sales of dimethyl carbonate and ethyl methyl carbonate |
2025-000003262 |
| The United States of America、 Louisiana |
B |
Environmental Review
|
|
| July 01, 2025 |
Molybdenum and vanadium separation and recovery business |
2025-000003141 |
| Malaysia、 Pahang |
A |
Environmental Review
|
|
| June 30, 2025 |
Credit Line for finance lease by Japanese small & medium sized Companies |
2025-000003698 |
| Developing area |
FI |
Environmental Review
|
|
| June 19, 2025 |
Credit Line under GREEN |
2025-000003573 |
| The Republic of Côte d'Ivoire |
FI |
Environmental Review
|
|
| June 12, 2025 |
Interconnection development project |
2022-0050 |
| Kingdom of Saudi Arabia、 Madinah Province, Tabuk Province |
A |
Environmental Review
|
|
| April 24, 2025 |
Two-Step Loan Project under GREEN |
2025-000003347 |
| Federative Republic of Brazil |
FI |
Environmental Review
|
|
| April 24, 2025 |
Investment in the fund that invests in early-stage deep tech startups, primarily in the United States |
2025-000003302 |
| The United States etc. |
FI |
Environmental Review
|
|
| April 22, 2025 |
Acquisition of rights and interests in coal mine |
2025-000003305 |
| Australia、 Queensland |
B |
Environmental Review
|
|
| March 25, 2025 |
Export of port cranes |
2024-000002924 |
| Republic of Ecuador、 El Oro |
A |
Environmental Review
|
|
| January 28, 2025 |
Expansion of a Geothermal Power Plant |
2024-000002131 |
| Republic of Indonesia、 West Sumatra |
B |
Environmental Review
|
|
| January 20, 2025 |
Renewable energy, energy transformation and energy efficiency projects |
2024-000003044 |
| India |
FI |
Environmental Review
|
|
| January 15, 2025 |
Wind power plant project |
2024-000002717 |
| Türkiye、 Bayburt |
B |
Environmental Review
|
|
| November 22, 2024 |
Expansion of a Wind Power Project |
2024-000002575 |
| Arab Republic of Egypt、 Red Sea Governorate |
B |
Environmental Review
|
|
| October 24, 2024 |
Financing for the Central and Eastern Europe |
2024-000002867 |
| Region of Central and Eastern Europe |
FI |
Environmental Review
|
|
| October 24, 2024 |
Onshore Wind Power Project |
2024-000002782 |
| Kingdom of Saudi Arabia、 Northern Borders Province |
B |
Environmental Review
|
|
| October 24, 2024 |
Onshore Wind Power Project |
2024-000002780 |
| Kingdom of Saudi Arabia、 Riyadh |
B |
Environmental Review
|
|
| October 23, 2024 |
Two-Step Loan Project under Emergency Operations |
2024-000002807 |
| Member Countries of the Black Sea Trade and Development Bank |
FI |
Environmental Review
|
|
| October 23, 2024 |
Two-Step Loan Project under GREEN |
2024-000002805 |
| Member Countries of the Black Sea Trade and Development Bank |
FI |
Environmental Review
|
|
| October 10, 2024 |
Two-Step Loan Project under GREEN |
2024-000002827 |
| Socialist Republic of Vietnam |
FI |
Environmental Review
|
|
| September 04, 2024 |
Wind Power Project |
2024-000002444 |
| India、 Karnataka |
B |
Environmental Review
|
|
| August 01, 2024 |
Manufacturing and sales of battery materials |
2024-000002098 |
| Thailand、 Rayong |
B |
Environmental Review
|
|
| July 24, 2024 |
Natural gas field development project |
2022-0020 |
| Socialist Republic of Vietnam、 Off the southwestern part of Vietnam |
A |
Environmental Review
|
|
| July 11, 2024 |
GREEN Credit Line |
2024-000002223 |
| United Arab Emirates and others |
FI |
Environmental Review
|
|
| June 27, 2024 |
Development of Copper Mine |
2023-0006 |
| the Republic of Chile、 Ⅳ region de Coquimbo |
A |
Environmental Review
|
|
| June 10, 2024 |
Manufacturing and sales of tire |
2024-000002314 |
| India、 Andra Pradesh |
B |
Environmental Review
|
|
| May 10, 2024 |
Expansion of Copper Mine |
2023-000001485 |
| the Republic of Chile、 Ⅱ region de Antofagasta |
A |
Environmental Review
|
|
| April 30, 2024 |
Natural gas field development project |
2024-000002020 |
| Commonwealth of Australia、 Western Australia and Offshore West of Australia |
A |
Environmental Review
|
|
| April 16, 2024 |
Gas-Fired Combined Cycle Power Plant Project |
2023-000001735 |
| Mexico、 Villa de Reyes, San Luis Potosi |
A |
Environmental Review
|
|
| April 16, 2024 |
Gas-Fired Combined Cycle Power Plant Project |
2023-000001728 |
| Mexico、 Salamanca, Guanajuato |
A |
Environmental Review
|
|
| March 29, 2024 |
Renewable Energy Project |
2024-000002234 |
| India |
FI |
Environmental Review
|
|
| March 29, 2024 |
Two-Step Loan Project under GREEN |
2024-000002079 |
| Latin American and Caribbean countries |
FI |
Environmental Review
|
|
| March 29, 2024 |
Solar Power Project |
2023-000001822 |
| India、 Rajasthan |
B |
Environmental Review
|
|
| March 27, 2024 |
JBIC Untied Loan to a financial institution for supporting agricultural machinery component manufacturers, agricultural machinery dealers and agricultural machinery sales financers which promote sales of Japanese OEMs’ agricultural machinery |
2023-000001988 |
| Republic of India |
FI |
Environmental Review
|
|
| March 27, 2024 |
Renewable Energy Project |
2023-000001417 |
| India |
FI |
Environmental Review
|
|
| January 26, 2024 |
Two-Step Loan Project under GREEN |
2023-000001903 |
| Türkiye |
FI |
Environmental Review
|
|
| January 26, 2024 |
Two-Step Loan Project under GREEN |
2024-000001874 |
| Türkiye |
FI |
Environmental Review
|
|
| October 06, 2023 |
Offshore wind power project |
2021-0165 |
| Taiwan、 Changhua offing |
A |
Environmental Review
|
|
| October 04, 2023 |
Equity participation in a fund investing in companies and projects in India |
2023-0015 |
| India |
FI |
Environmental Review
|
|
| September 12, 2023 |
Equity participation in a fund investing in start-ups |
2022-0134 |
| The northern European region |
FI |
Environmental Review
|
|
| September 11, 2023 |
Offshore wind power project |
2022-0094 |
| French Republic、 Normandie region |
A |
Environmental Review
|
|
| September 11, 2023 |
Offshore wind power project |
2022-0093 |
| French Republic、 Pays de la Loire |
A |
Environmental Review
|
|
| August 28, 2023 |
Waste to Energy project |
2023-000001357 |
| India、 Karnataka |
B |
Environmental Review
|
|
| July 06, 2023 |
Financing for the South East Asia |
2023-0012 |
| South East Asia |
FI |
Environmental Review
|
|
| June 14, 2023 |
Guarantee for Privately Placed Samurai Bond |
2023-0011 |
| - |
FI |
Environmental Review
|
|
| June 09, 2023 |
Credit line for small and medium-sized business overseas |
2022-0085 |
| The Republic of Indonesia |
FI |
Environmental Review
|
|
| May 31, 2023 |
Equity participation in a fund investing in start-ups |
2022-0130 |
| The central and eastern European region |
FI |
Environmental Review
|
|
| May 08, 2023 |
Expansion project of tinplate manufacturing line |
2022-0029 |
| Republic of Turkey、 Osmaniye |
B |
Environmental Review
|
|
| April 27, 2023 |
Gas-Fired Combined Cycle Power Project |
2022-0011 |
| Republic of Uzbekistan、 Syrdarya Region |
A |
Environmental Review
|
|
| April 21, 2023 |
Investment in expansion of a steel plant |
2022-0118 |
| Republic of India、 State of Gujarat |
A |
Environmental Review
|
|
| April 20, 2023 |
Solar Power Project |
2022-0161 |
| India |
FI |
Environmental Review
|
|
| April 20, 2023 |
Solar Power Project |
2022-0137 |
| India、 Gujarat |
B |
Environmental Review
|
|
| April 19, 2023 |
Construction of new pellet feed plant |
2022-0019 |
| Federative Republic of Brazil、 Minas Gerais |
B |
Environmental Review
|
|
| April 07, 2023 |
Wind Power Project |
2021-0082 |
| Arab Republic of Egypt、 Red Sea Governorate |
B |
Environmental Review
|
|
| April 06, 2023 |
JBIC Untied Loan to a financial institution for supporting the construction machinery manufacturers’ supply chain |
2022-0164 |
| Republic of India |
FI |
Environmental Review
|
|
| April 06, 2023 |
Wind Power Project |
2019-0091 |
| Arab Republic of Egypt、 Red Sea Governorate |
B |
Environmental Review
|
|
| April 04, 2023 |
Waste to Energy project |
2022-0080 |
| India、 Maharashtra |
B |
Environmental Review
|
|
| April 03, 2023 |
Two step loan to support renewable energy projects under GREEN |
2022-0132 |
| Socialist Republic of Vietnam |
FI |
Environmental Review
|
|
| March 15, 2023 |
Production and sales of chemical products |
2022-0123 |
| Republic of Singapore、 Jurong island |
B |
Environmental Review
|
|
| March 09, 2023 |
Expansion of substation and transmission lines |
2021-0086 |
| Kingdom of Saudi Arabia、 Tabuk Province |
B |
Environmental Review
|
|
| March 09, 2023 |
Construction of substation and transmission lines |
2021-0074 |
| Kingdom of Saudi Arabia、 Al Qassim Province |
B |
Environmental Review
|
|
| February 14, 2023 |
Credit Line for finance lease by Japanese small & medium sized Companies |
2022-0127 |
| Developing area |
FI |
Environmental Review
|
|
| December 28, 2022 |
Renewable Energy Project |
2022-0111 |
| Republic of Indonesia |
FI |
Environmental Review
|
|
| December 23, 2022 |
Irrigation Project |
2021-0062 |
| Republic of Peru、 Arequipa |
A |
Environmental Review
|
|
| November 28, 2022 |
Railway Project |
2022-0009 |
| Canada、 Province of Ontario |
A |
Environmental Review
|
|
| October 07, 2022 |
HVDC cable transmission project |
2022-0034 |
| United Arab Emirates/Emirate of Abu Dhabi |
A |
Environmental Review
|
|
| September 16, 2022 |
Expansion project for Industrial Park |
2021-0216 |
| Socialist Republic of Viet Nam、 Hung Yen Province |
A |
Environmental Review
|
Thang Long Industrial Park Ⅱ
|
| August 26, 2022 |
Electricity interconnector project |
2021-0125 |
| United Kingdom etc、 North Sea |
A |
Environmental Review
|
|
| July 25, 2022 |
Renewable energy and Energy Efficiency |
2021-0223 |
| Republic of India |
FI |
Environmental Review
|
|
| June 01, 2022 |
JBIC Untied Loan to a financial institution for supporting the healthcare sector related to COVID-19 |
2022-0012 |
| India |
FI |
Environmental Review
|
|
| April 25, 2022 |
Wind power project |
2021-0116 |
| Turkey、 Bursa |
B |
Environmental Review
|
|
| March 14, 2022 |
Credit Line for M&A and Overseas Business |
2021-0206 |
| Developing and developed area |
FI |
Environmental Review
|
|
| March 08, 2022 |
Wind power project |
2021-0117 |
| Turkey、 Yalova |
B |
Environmental Review
|
|
| March 07, 2022 |
Investment in a hydrogen fund |
2021-0202 |
| Global |
FI |
Environmental Review
|
|
| March 02, 2022 |
Two-Step Loan Project under GREEN |
2021-0186 |
| Turkey |
FI |
Environmental Review
|
|
| December 27, 2021 |
Solar Power Project |
2020-0152 |
| Commonwealth of Australia、 Queensland |
B |
Environmental Review
|
|
| December 27, 2021 |
Development of natural gas fields and construction/operation of LNG plant |
2020-0049 |
| Australia、 Northern Territory and Offshore |
A |
Environmental Review
|
|
| October 29, 2021 |
LNG Project |
2020-0168 |
| Canada、 British Columbia |
A |
Environmental Review
|
|
| October 22, 2021 |
Cement plant expansion project |
2021-0011 |
| Republic of the Philippines、 Cebu Island |
B |
Environmental Review
|
|
| September 27, 2021 |
Solar power project |
2020-0176 |
| The United Mexican States、 Durango |
B |
Environmental Review
|
|
| September 27, 2021 |
Solar power project |
2020-0175 |
| The United Mexican States、 Coahuila |
B |
Environmental Review
|
|
| August 19, 2021 |
Manufacturing and sales of tire |
2021-0026 |
| India、 Andhra Pradesh |
B |
Environmental Review
|
|
| July 20, 2021 |
GREEN projects in the field of electric power transmission and distribution |
2021-0069 |
| Kingdom of Saudi Arabia |
FI |
Environmental Review
|
|
| July 13, 2021 |
Production and sales of steel sheets |
2021-0043 |
| Mexico、 Guanajuato |
B |
Environmental Review
|
|
| July 08, 2021 |
Investment in a renewable energy fund |
2020-0205 |
| Developing countries、 (Global) |
FI |
Environmental Review
|
|
| July 01, 2021 |
Expansion of afforestation business |
2021-0065 |
| Federative Republic of Brazil、 Amapá State |
B |
Environmental Review
|
|
| June 29, 2021 |
Development of natural gas fields project |
2021-0004 |
| Australia、 Western Australia |
A |
Environmental Review
|
|
| June 15, 2021 |
Investment in the fund that invests in technology-related companies mainly in the United States |
2021-0031 |
| the United States etc. |
FI |
Environmental Review
|
|
| May 18, 2021 |
De-Characterization of Mining facilities |
2020-0105 |
| Brazil、 Minas Gerais |
A |
Environmental Review
|
|
| April 14, 2021 |
Operation of mine |
2020-0166 |
| Australia、 Queensland |
B |
Environmental Review
|
|
| April 13, 2021 |
Two-Step Loan Project under GREEN |
2020-0192 |
| Turkey |
FI |
Environmental Review
|
|
| April 07, 2021 |
JBIC Untied Loan to a financial institution for supporting the automotive industry in India |
2020-0199 |
| India |
FI |
Environmental Review
|
|
| March 31, 2021 |
Credit Line under GREEN |
2020-0197 |
| the Republic of Benin |
FI |
Environmental Review
|
|
| March 30, 2021 |
Waste Management Project |
2020-0024 |
| the United Arab Emirates、 the Emirate of Dubai Warsan |
A |
Environmental Review
|
|
| March 26, 2021 |
Development of mine |
2020-0111 |
| United States of America、 West Virginia |
A |
Environmental Review
|
|
| March 25, 2021 |
Solar Power Project |
2020-0079 |
| Saudi Arabia、 Makkah |
B |
Environmental Review
|
|
| February 25, 2021 |
Construction of submarine cable |
2020-0106 |
| Republic of Palau、 Ngardmau |
B |
Environmental Review
|
|
| January 29, 2021 |
Production and Sales of Plastics |
2020-0155 |
| Federal Republic of Germany、 Sachsen-Anhalt |
B |
Environmental Review
|
|
| December 29, 2020 |
Coal-fired Power Plant Project |
2019-0095 |
| Socialist Republic of Vietnam、 Ha Tinh Province |
A |
Environmental Review
|
|
| December 10, 2020 |
Two-Step Loan Project under GREEN |
2020-0013 |
| The United Mexican States |
FI |
Environmental Review
|
|
| November 02, 2020 |
JBIC Untied Loan to a financial institution for supporting the automotive industry in India |
2020-0112 |
| India |
FI |
Environmental Review
|
|
| October 14, 2020 |
Development of the oil field |
2020-0076 |
| United Arab Emirates、 The Emirates of Abu Dhabi |
B |
Environmental Review
|
|
| October 14, 2020 |
Development of the oil field |
2020-0075 |
| United Arab Emirates、 The Emirates of Abu Dhabi |
B |
Environmental Review
|
|
| October 14, 2020 |
Development of the oil field |
2020-0074 |
| United Arab Emirates、 The Emirates of Abu Dhabi |
B |
Environmental Review
|
|
| August 19, 2020 |
Natural gas-fired Combined Cycle Power Plant Project |
2019-0063 |
| People's Republic of Bangladesh、 District Narayangnj |
A |
Environmental Review
|
|
| July 28, 2020 |
Solar Power Project |
2020-0010 |
| State of Qatar、 Doha |
B |
Environmental Review
|
|
| July 16, 2020 |
Development of gas fields and construction/operation of LNG plant |
2016-0027 |
| Republic of Mozambique、 Cabo Delgado Province |
A |
Environmental Review
|
|
| July 14, 2020 |
Development of natural gas field |
2019-0007 |
| Russian Federation、 Gydan Peninsula |
A |
Environmental Review
|
|
| May 14, 2020 |
Manufacturing and sales of tire |
2019-0015 |
| Republic of South Africa、 North West Province |
B |
Environmental Review
|
|
| April 09, 2020 |
Two-Step Loan Project under GREEN |
2019-0109 |
| Latin America and the Caribbean region |
FI |
Environmental Review
|
|
| April 09, 2020 |
Development and operation of real estate complex |
2019-0102 |
| Republic of the Union of Myanmar |
B |
Environmental Review
|
|
| January 24, 2020 |
Credit Line for Overseas Business |
2019-0076 |
| People's Republic of China |
FI |
Environmental Review
|
|
| January 16, 2020 |
Credit Line for finance lease by Japanese small & medium sized Companies |
2019-0059 |
| Developing area |
FI |
Environmental Review
|
|
| January 14, 2020 |
Export of Wire Rod Mill equipments |
2019-0071 |
| India、 State of Karnataka |
B |
Environmental Review
|
|
| December 13, 2019 |
Investment in the fund of venture capital funds |
2019-0060 |
| Global |
FI |
Environmental Review
|
|
| December 03, 2019 |
Natural gas-fired Combined Cycle Power Plant Project |
2019-0016 |
| The Kingdom of Thailand、 Rayong Province |
A |
Environmental Review
|
|
| November 27, 2019 |
Fertilizer Plant Construction Project |
2018-0068 |
| Bangladesh、 Narsingdi |
A |
Environmental Review
|
|
| November 20, 2019 |
Expansion of desalination plant |
2019-0005 |
| State of Qatar、 Doha |
B |
Environmental Review
|
Umm Al Houl Power
|
| November 13, 2019 |
Development of lead mine |
2019-0034 |
| Australia、 West Australia |
A |
Environmental Review
|
|
| November 06, 2019 |
Credit Line for Overseas Business |
2019-0054 |
| People's Republic of China |
FI |
Environmental Review
|
|
| October 16, 2019 |
Construction and operation of the Auto Port |
2019-0026 |
| Republic of Turkey、 Kocaeli Province |
B |
Environmental Review
|
|
| September 10, 2019 |
Construction of new glass factory project |
2018-0139 |
| America、 Ohio |
B |
Environmental Review
|
|
| September 06, 2019 |
Investment in the fund that provides loans and equity for microfinance institutions in ASEAN countries etc. |
2019-0032 |
| ASEAN countries etc. |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2019-0001 |
| Developing and developed area |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2018-0114 |
| Developing and developed area |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2018-0104 |
| Developing and developed area |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2018-0100 |
| Developing and developed area |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2018-0098 |
| Developing and developed area |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit line for small and medium-sized business overseas |
2017-0205 |
| Developing countries |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit line for small and medium-sized business overseas |
2017-0170 |
| The Republic of Indonesia |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit line for small and medium-sized business overseas |
2017-0076 |
| Developing countries |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit line for small and medium-sized business overseas |
2017-0002 |
| Developing contries |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit line for small and medium-sized business overseas |
2015-0174 |
| developing countries |
FI |
Environmental Review
|
|
| August 08, 2019 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2015-0157 |
| Developing and developed area |
FI |
Environmental Review
|
|
| July 05, 2019 |
Credit Line for M&A and Overseas Business |
2019-0011 |
| Developing and developed area |
FI |
Environmental Review
|
|
| July 01, 2019 |
Bank Loan (Export Credit) |
2019-0025 |
| Russian Federation |
FI |
Environmental Review
|
|
| June 28, 2019 |
Two step loan to support renewable energy projects |
2019-0022 |
| Socialist Republic of Vietnam |
FI |
Environmental Review
|
|
| June 13, 2019 |
Acquisition of rights and interest in copper mine |
2016-0057 |
| USA、 Arizona |
B |
Environmental Review
|
|
| June 03, 2019 |
Global Bank Loan |
2019-0008 |
|
FI |
Environmental Review
|
|
| May 31, 2019 |
Expansion of Copper Mine |
2018-0148 |
| the Republic of Chile、 Ⅰ region de Tarapaca |
A |
Environmental Review
|
|
| May 29, 2019 |
Manufacturing of Acrylic Acid and other products. |
2018-0120 |
| Indonesia、 Banten |
A |
Environmental Review
|
|
| May 27, 2019 |
Global Bank Loan |
2018-0159 |
|
FI |
Environmental Review
|
|
| May 21, 2019 |
Wind Power Project |
2018-0021 |
| The United Mexican States、 Nuevo Leon State |
B |
Environmental Review
|
|
| May 21, 2019 |
Solar Power Project |
2018-0019 |
| The United Mexican States、 Hidalgo State |
B |
Environmental Review
|
|
| May 15, 2019 |
Coal-fired Power Plant Project |
2018-0103 |
| Socialist Republic of Viet Nam、 Khanh Hoa Province |
A |
Environmental Review
|
VPCL
|
| April 24, 2019 |
Production and Sales of Refined Products and Petrochemical Products |
2018-0070 |
| Malaysia、 Johor |
A |
Environmental Review
|
|
| April 11, 2019 |
Development of Copper Mine |
2018-0149 |
| Republic of Peru、 Moquegua |
B |
Environmental Review
|
|
| April 11, 2019 |
Combined Cycle Power Plant |
2018-0066 |
| Emirates of Sharjah, the United Arab Emirates、 Layyah |
A |
Environmental Review
|
|
| April 05, 2019 |
Mineral Resources Export Terminal Rehabilitation |
2018-0125 |
| Angola、 Namibe |
A |
Environmental Review
|
|
| April 05, 2019 |
Port Expansion for New Container Terminal |
2018-0124 |
| Angola、 Namibe |
A |
Environmental Review
|
|
| April 03, 2019 |
Thermal Power Project |
2018-0060 |
| Emirate of Sharjah, the United Arab Emirates、 Hamriyah |
A |
Environmental Review
|
|
| March 28, 2019 |
Expansion of Copper Mine |
2018-0107 |
| the Republic of Chile、 V region de Coquimbo |
A |
Environmental Review
|
LOS PELAMBRES
|
| March 11, 2019 |
Credit Line for M&A and Overseas Business |
2018-0150 |
| Developing and developed area |
FI |
Environmental Review
|
|
| March 08, 2019 |
Gas field Development |
2017-0028 |
| Vietnam |
A |
Environmental Review
|
|
| February 25, 2019 |
Credit Line for M&A and Overseas Business |
2018-0117 |
| Developing and developed area |
FI |
Environmental Review
|
|
| February 19, 2019 |
Credit Line for M&A and Overseas Business |
2018-0116 |
| Developing and developed area |
FI |
Environmental Review
|
|
| February 04, 2019 |
M&A Credit Line to Japanese Companies |
2018-0099 |
| Developed countries & developing areas |
FI |
Environmental Review
|
|
| January 23, 2019 |
Redevelopment of Yangon museum site |
2016-0140 |
| Republic of the Union of Myanmar、 Yangon |
B |
Environmental Review
|
|
| January 17, 2019 |
Credit Line for M&A and Overseas Business |
2018-0091 |
| Developing and developed area |
FI |
Environmental Review
|
|
| January 15, 2019 |
Investment in the fund that invests in deep tech start-ups |
2018-0078 |
| The Nordic and Baltic region |
FI |
Environmental Review
|
|
| December 26, 2018 |
Global Bank Loan |
2018-0082 |
| The Republic of Argentina |
FI |
Environmental Review
|
|
| December 25, 2018 |
Credit Line for M&A and Overseas Business |
2018-0089 |
| Developing and developed area |
FI |
Environmental Review
|
|
| December 25, 2018 |
Credit Line for M&A and Overseas Business |
2018-0088 |
| Developing and developed area |
FI |
Environmental Review
|
|
| December 25, 2018 |
Credit Line for M&A and Overseas Business |
2018-0086 |
| Developing and developed area |
FI |
Environmental Review
|
|
| December 25, 2018 |
Credit Line for M&A and Overseas Business |
2018-0083 |
| Developing and developed area |
FI |
Environmental Review
|
|
| December 21, 2018 |
New Polyethylene Plant Construction Project |
2018-0037 |
| Republic of Indonesia、 Banten Province |
A |
Environmental Review
|
MoEF
|
| December 12, 2018 |
Credit Line for finance lease by Japanese small & medium sized Companies |
2018-0092 |
| Developing area |
FI |
Environmental Review
|
|
| December 04, 2018 |
Offshore wind power project |
2018-0036 |
| UK、 Scotland |
A |
Environmental Review
|
|
| November 22, 2018 |
Gas-fired Combined Cycle Power Plant Project |
2018-0012 |
| The Kingdom of Thailand、 Chon Buri Province |
A |
Environmental Review
|
|
| November 14, 2018 |
Extension and acquisition of right and interests in oil field |
2018-0043 |
| United Arab Emirates、 The Emirates of Abu Dhabi |
B |
Environmental Review
|
|
| November 14, 2018 |
Acquisition of right and interests in oil field |
2018-0042 |
| United Arab Emirates、 The Emirates of Abu Dhabi |
B |
Environmental Review
|
|
| October 22, 2018 |
Gas-fired Combined Cycle Power Plant Project |
2018-0028 |
| Republic of Indonesia、 West Java Province |
A |
Environmental Review
|
|
| August 30, 2018 |
M&A Credit Line to Japanese Companies |
2018-0052 |
| Developed countries & developing areas |
FI |
Environmental Review
|
|
| August 15, 2018 |
Subscription to the capital increase in the fund which guarantees the bond |
2017-0084 |
| ASEAN+3 |
FI |
Environmental Review
|
|
| July 20, 2018 |
M&A Credit Line to Japanese Companies |
2018-0034 |
| Developed countries & developing areas |
FI |
Environmental Review
|
|
| July 20, 2018 |
M&A Credit Line to Japanese Companies |
2018-0033 |
| Developed counties & developing areas |
FI |
Environmental Review
|
|
| July 20, 2018 |
M&A Credit Line to Japanese Companies |
2018-0032 |
| Developed countries & developing areas |
FI |
Environmental Review
|
|
| July 18, 2018 |
Construction of Gas Turbine Power Plant |
2016-0008 |
| Turkmenistan、 Lebap Province |
A |
Environmental Review
|
|
| May 28, 2018 |
Export Bank Loan |
2018-0014 |
| Russian Federation and its neighboring countries |
FI |
Environmental Review
|
|
| April 19, 2018 |
Coal-fired Power Plant Project |
2017-0189 |
| Socialist Republic of Viet Nam、 Thanh Hoa Province |
A |
Environmental Review
|
NS2PC
|
| April 17, 2018 |
Export of Cold Rolling Mill equipments |
2017-0196 |
| India、 State of Karnataka |
B |
Environmental Review
|
|
| March 28, 2018 |
Geothermal Power Plant Project |
2017-0046 |
| Republic of Indonesia、 South Sumatra |
A |
Environmental Review
|
|
| March 22, 2018 |
Investment in the fund that invests in technology-related companies mainly in the United States |
2017-0185 |
| the United States etc. |
FI |
Environmental Review
|
|
| December 08, 2017 |
Wind Power Project |
2015-0102 |
| Arab Republic of Egypt、 Red Sea Governorate |
B |
Environmental Review
|
|
| November 28, 2017 |
Quito Metro Project |
2017-0057 |
| Republic of Ecuador、 Pichincha |
A |
Environmental Review
|
|
| November 13, 2017 |
Coal-fired Power Plant Project |
2016-0082 |
| Republic of Indonesia、 West Java |
A |
Environmental Review
|
|
| October 27, 2017 |
Solar power plant project |
2017-0030 |
| Republic of India、 Andra Pradesh |
B |
Environmental Review
|
|
| September 13, 2017 |
Wind power plant |
2017-0055 |
| Turkey、 Gaziantep |
B |
Environmental Review
|
|
| September 08, 2017 |
Investment in the fund that invests in companies mainly in Russian Federation |
2017-0054 |
| Russian Federation etc. |
FI |
Environmental Review
|
|
| August 09, 2017 |
Hospital Project |
2016-0145 |
| Republic of Turkey、 Istambul |
B |
Environmental Review
|
|
| August 03, 2017 |
Copper Mine Project |
2017-0003 |
| Chile、 Region Ⅱ |
A |
Environmental Review
|
|
| July 19, 2017 |
Coal-fired Power Plant Project |
2017-0032 |
| Republic of Indonesia、 South Kalimantan |
A |
Environmental Review
|
|
| July 07, 2017 |
Acquisition of right and interests in oil field |
2017-0029 |
| The United Arab Emirates、 The Emirate of Abu Dhabi |
B |
Environmental Review
|
|
| April 18, 2017 |
Extension Thermal Power Plant Project |
2016-0062 |
| Social Republic of Vietnam、 Binh Thuan Province |
A |
Environmental Review
|
|
| April 13, 2017 |
Kuwait Clean Fuels Project |
2016-0031 |
| Kuwait、 Ahmadi |
A |
Environmental Review
|
|
| March 30, 2017 |
The construction of the Gas-Fired Combined Cycle Power Plant Project |
2016-0141 |
| Indonesia、 Jakarta |
A |
Environmental Review
|
|
| March 08, 2017 |
Two Step-Loan to overseas subsidiaries of Japanese small and medium-sized enterprises |
2016-0154 |
| Developing area |
FI |
Environmental Review
|
|
| February 27, 2017 |
Coal-fired Power Plant Project |
2016-0073 |
| Republic of Indonesia、 Central Java Province |
A |
Environmental Review
|
|
| February 22, 2017 |
Credit line for energy efficiency projects |
2016-0136 |
| The Republic of Ecuador |
FI |
Environmental Review
|
|
| January 30, 2017 |
Geothermal Power Plant Project |
2016-0059 |
| Republic of Indonesia、 West Sumatra |
A |
Environmental Review
|
2021H2 10th Monitoring Result
|
| January 05, 2017 |
Credit line for small and medium-sized business overseas |
2016-0151 |
| Developing contries |
FI |
Environmental Review
|
|
| December 16, 2016 |
Two Step-Loan to overseas subsidiaries of Japanese small and medium-sized enterprises |
2016-0146 |
| Developing area |
FI |
Environmental Review
|
|
| December 16, 2016 |
Credit Line for M&A and Small and Medium-sized Business Overseas |
2016-0143 |
| Developing and developed area |
FI |
Environmental Review
|
|
| October 28, 2016 |
Gas Combined Cycle Power Plant |
2016-0080 |
| Indonesia、 Jakarta |
A |
Environmental Review
|
|
| September 13, 2016 |
Investment in the fund that provides loans and equity to microfinance institutions in ASEAN countries etc. |
2016-0090 |
| ASEAN countries etc. |
FI |
Environmental Review
|
|
| August 17, 2016 |
Expansion of LNG Plant |
2016-0007 |
| INDONESIA、 Papua Barat Province |
A |
Environmental Review
|
|
| May 06, 2016 |
Investment in a fund that invests in large companies in North America and Mexico |
2016-0035 |
| North America and Mexico |
FI |
Environmental Review
|
|
| April 25, 2016 |
Geothermal Power Plant Project |
2016-0023 |
| Turkey |
B |
Environmental Review
|
|
| April 14, 2016 |
Two step loan to support renewable energy projects and energy efficiency projects |
2016-0050 |
| Latin America |
FI |
Environmental Review
|
|
| April 06, 2016 |
Two step loan to support renewable energy projects and energy efficiency projects |
2016-0041 |
| The United Mexican States |
FI |
Environmental Review
|
|
| March 16, 2016 |
Thermal Power Plant Project |
2015-0185 |
| Indonesia、 Banten Province |
A |
Environmental Review
|
|
| March 04, 2016 |
Two Step-Loan to overseas subsidiaries of Japanese small and medium-sized enterprises |
2016-0021 |
| Developing area |
FI |
Environmental Review
|
|
| January 29, 2016 |
Investment in a fund that invests in mid-cap companies in Asia |
2015-0177 |
| Asia |
FI |
Environmental Review
|
|
| January 05, 2016 |
Export of geothermal power plant machinery |
2015-0090 |
| Iceland、 Theistareykir |
A |
Environmental Review
|
Landsvirkjun
|