Project outline
Construction and operation of LNG plants and pipelines, etc.
Reason of Categorization
This project falls into pipelines and oil, gas and chemical terminals under the Environment Guidelines and has sensitive characteristics under the Environment Guidelines. The project site is also located in or near sensitive areas.
Documents that JBIC has already acquired
- Overview_00.01
- Overview_00.02
- Overview_00.03
- Overview_00.04
- Overview_00.05
- Overview_00.06
- Part A_01
- Part A_02
- Part A_03
- Part B_04
- Part B_05.01
- Part B_05.02
- Part B_05.03
- Part B_05.04
- Part B_05.05
- Part B_05.06
- Part B_05.07
- Part B_05.08
- Part B_05.09
- Part B_05.10
- Part B_06
- Part B_07.01
- Part B_07.02
- Part B_07.03
- Part B_07.04
- Part B_07.05
- Part B_07.06
- Part_B_08
- Part B_09
- Part B_10
- Part B_11
- Part B_12
- Part C_13
- Part C_14
- Part C_15
- Part C_16
- Part C_17
- Part D_18
- Part E_19
- Part E_20
- Part E_21
- Part E_22
- Part E_23
- Part E_24
- Certificate E15-01
- Schedule A
- Schedule B
- Aboriginal Consultation Plan
- AD100110266_PERMIT
Remarks
With regard to construction and operation of the pipeline in the scope of the project, ESIA is not required under the local environmental assessment system. The alternative document for ESIA is uploaded.
* Date of Release:October 29, 2021
* Category:A
* Project Site:
Canada
, British Columbia
* Reference Number:2020-0168