Project outline
The project consists of the construction, possession and operation of coal-fired power plant.
Reason of Categorization
The project belongs to coal-fired power sector and includes sensitive characteristics under the Environmental Guidelines.
Documents that JBIC has already acquired
- 201603_ANDAL_01_Cover_ANDAL
- 201603_ANDAL_02_Preface_ANDAL
- 201603_ANDAL_03_DAFTAR_ISI_ANDAL
- 201603_ANDAL_04_BabI_ANDAL
- 201603_ANDAL_05_BabII_ANDAL
- 201603_ANDAL_06_BabIII_ANDAL
- 201603_ANDAL_07_Bab_IV_ANDAL
- 201603_ANDAL_07_DAFTAR_PUSTAKA
- 201603_ANDAL_Lampiran1_ Hasil_Lab1
- 201603_ANDAL_Lampiran1_Hasil_Lab2
- 201603_ANDAL_Lampiran2_Jenis_Ikan_PASCA_SIDTEK
- 201603_ANDAL_Lampiran3_Lokasi_Survey
- 201603_ANDAL_Lampiran4_Coal_Stockpile_Management_Self Combustion_Control_Procedure
- 201603_ANDAL_Lampiran5_SK_Persetujuan_Kerangka_Acuan_PLTU_TJB5dan6
- 201603_ANDAL_Lampiran6_Geteran
- 201603_ANDAL_Lampiran6_Kebisingan
- 201603_ANDAL_Lampiran6_Konsetrasi_TSS
- 201603_ANDAL_Lampiran6_Pemodelan
- 201603_ANDAL_Lampiran6_Permodelan_Emisi_Stack_5.6
- 201603_RKL.RPL_01_Cover_RKL-RPL
- 201603_RKL.RPL_02_Preface_RKL-RPL
- 201603_RKL.RPL_03_DAFTAR_ISI_RKL-RPL
- 201603_RKL.RPL_04_Bab_I_RKL-RPL
- 201603_RKL.RPL_05_Bab_II_RKL
- 201603_RKL.RPL_06_Bab_III_RPL
- 201603_RKL.RPL_07_Bab_IV_Jumlah_dan_Jenis_Izin_PPLH
- 201603_RKL.RPL_08_Sattement_Letter
- 201603_RKL.RPL_09_PETA_RKL
- 201603_RKL.RPL_10_PETA_RPL
- 201605_Izin_Lingkungan
- 201605_Kelayakan_Lingkungan
Remarks
* Date of Release:February 27, 2017
* Category:A
* Project Site:
Republic of Indonesia
, Central Java Province
* Reference Number:2016-0073